E.ON
UK, Killingholme Power Station, North
Lincolnshire
“Killingholme Power Station was brought
back into service in Summer 2005. During preparations
to restore one of the station’s modules
to active service, our operators discovered
two faulty joints in one of the 1.8m-diameter
return pipelines located underground below
the generator compound. The station uses cooling
water from the Humber Estuary at a working
pressure of 2 bar. The AMEX-10 seal was
an ideal choice for the harsh, salt water
conditions and as a low profile mechanical
seal there is no obstruction to flow. PMP
completed the work in just two days and the
results are very satisfactory. Above all,
PMP provided the solution without any excavation
being necessary.”
Julian Buckley, Engineer,
E.ON UK |