Case Histories - Kingairloch Hydro Scheme
Client: Amco Construction
Service:
AMEX®-10-Seal
Project: Joint repair to 900mm pipeline on gradients of upto 50% |
|
|
| |
|
|
|
|
 |
| |
Internal
AMEX®-10-Seal repair of hydroelectric pipeline by PMP
PMP was recently appointed by AMCO Construction to carry out remedial
works to a number of joints on a buried pipeline. The pipeline forms
the penstock for one of Scotland’s newest hydro electric schemes
at Kingairloch, which is located on the East side of the Morvern peninsula,
23 miles south west of Fort William.
Kingairloch Hydro Scheme has a generation capacity of 3.5 megawatts
with a gross operating head of 143m. The scheme is located on the Kingairloch
Estate on the Morvern Peninsula within the Abhainn na Coinnich river
catchment. It includes a storage reservoir at Loch Uisge with water
diverted from a number of tributaries of the Abhainn na Coinnich.
The penstock includes approximately 4500 m of buried pipe made up from
approximately 3500 meters of 1200 mm diameter and 1000 meters of 900
mm diameter. The penstock pipeline is buried in a trench over upland
terrain at variable gradients up to 50 % and is rated between PN 6
and PN 25. The pipeline had to be laid to very tight dimensional tolerances.
Subsequently a number of the joints between sections of the pipeline
did not conform to the specification.
AMCO Construction contacted PMP for a solution to the out-of-tolerance
joints. PMP proposed using the AMEX-10-Seal, which is a low profile
mechanical seal for internal repair of leaking pipe joints. A robust
section of rubber that spans the joint is fitted using hydraulic expansion
of stainless steel compression rings, thus eliminating the use of chemical
adhesives and their associated hazards. The seal accommodates substantial
joint movement and is abrasion resistant. Each seal has an independently
verified life expectancy of more than 50 years.
PMP engineers used roped access skills to fit the unique AMEX-10-Seals
from within the pipe. By completing all repairs internally, trenching
and service costs were avoided. The Kingairloch scheme presented PMP
with difficult working conditions. PMP’s Stephen Taylor explained
that roped access was required to reach down to pipe joints where the
operating pressure approached 25 bar. Working from a removed section
of the 900mm pipe, the PMP engineer was lowered to the location of
each leaking joint, in order to carry out the preparation and fitting
of the seals. In total 28 seals were fitted over a period of 2-3 months.
Paul Owen, Contracts Manager for AMCO, commented: ‘PMP did a
superb job in arduous conditions. Their service was very effective
with a rapid response.’ |
|
|
|
|
|