Case Histories - United Utilities

Client: Unitied Utilities
Service: One Offs
Project: Straining Tower, Lake Vyrnwy, Powys

     

News

 
Achilles UVDB Verify
IWEX, see us on Stand C1

20-22 April 2010
NEC, Birmingham
Stand C1

 
 
When it was built in the 1880’s, Lake Vyrnwy was the largest reservoir in Europe. When the existing valves and tapers in the straining tower needed to be replaced, PMP was appointed to survey the site prior to installing new butterfly valves.

The survey included the measurement of the existing valves, the measurement of the pitch circle diameter of the flanges and the bolt details. We also carried out a full structural survey to find suitable locations for the lifting gear supports and to check adequacy of support for the lifting gear.

Divers were employed to carry out surveys on the outside of the tower. PMP designed, fabricated and installed new access decking, hand rails and lifting gear to enable the installation of the 2.5 tonne valves. Once the access equipment and cranage had been installed, PMP installed the new butterfly valves prior to testing and commissioning them.