The reservoir inlet from the hill side had become scaled up with moss and other debris which affected the measurement of flows into the reservoir. The monitoring station also needed to be refurbished.

PMP cleaned off all the moss and debris from the inlet walls and base and applied a smooth cementitious coating to the surfaces. The monitoring station was refurbished, with works being carried out to the interior and exterior of the building and adjacent paths.